Copyright © 2016 | Gunjan Paints Limited, All rights reserved.
For better result apply 1 coat Illusion sealer directly on the bare wall or apply 1 coat of Wall Coat Exterior Primer with 70% dilution or self priming i.e. paint : water = 1 :1 ( v/v ). After tull drying apply 2 to 3 coats of UMBRELLA COAT by brush/roller. Allow over night gap between the coats.
Do's | Don't |
Stir well before using the paint | Apply paint on a damped wall |
Strain the paint through clean cloth berfore application. | Apply paint on lime wash surfaces. |
Use Bio wash 1 or 2 coats for killing fungal growth. | Over thin the paint. |
Scrape of all old paint throughly before painting | Apply paint when ambient temperature is below10C |
Gyroshake well after tinting through CB Machine | Apply paint when temperature is above 45 deg. C. |
Use soft drinking / municipal water | Apply paint on direct metal |
Apply 1 coat extra on top of horizontal surface | Use hard water while diluring the paint. |
For deep shade apply 1 additional coat. |
PACKING | Packed in 1 ltr, 4 ltrs, 20 ltrs. |
OFFERED SHADE RANGE | Over 2000 shades. |
DENSITY | 1.34 + / - 0.01 when released. |
VOC | As per bases Gms / Ltr 15 -20 |
FOR DARK SHADES ONLY | Maximum dilution should be 10-15% depending on shade. Coverage may be less as compared to ligh shades. |
SR. NO. | TEST | SPECIFICATION |
1 | FINISH | SMOOTH, UNIFOM, MATT |
2 | VISCOSITY | 35 ---50 SEC (100GM SAM+50GMWAT) |
3 | WT/LTR | 1.33—1.43 KGS /LTR |
4 | SETTLING | SOFT & MIXABLE |
5 | PH | 8 TO 10 |
6 | DRYING TIME | (a) SURFACE : 10MIN (b) TAKE FREE : 1.00-2.00HRS (c) HARD : 24.00HRS |
7 | FINISH | SMOOTH, UNIFORM ,&MATT |
8 | COVERING /LTR | 8 TO 12 Sqmeter /LIR |
9 | ADHESION | PASSES |